الجدول الزمني للمشروع
June 2025موقع المشروع
Singaporeنوع المرجل
غلاية بخاريةنوع الوقود
الغاز
تقع في سنغافورة, this project involved the supply of a 1-غلاية بخارية تعمل بالغاز طن by Dabonn Energy, designed to provide a stable and continuous steam supply for the client’s production line. Considering Singapore’s strict requirements for equipment safety, كفاءة الطاقة, and emission standards, the boiler system was carefully engineered with a focus on operational reliability and long-term operating cost control.
The steam boiler features rapid start-up, إخراج بخار مستقر, and high thermal efficiency, ensuring reliable performance under continuous operating conditions. Its compact structure and small footprint allow for flexible installation, while the optimized system design simplifies on-site installation and routine maintenance, reducing downtime and overall operating costs.
Since commissioning, the boiler has been operating smoothly with stable steam output. The client has expressed satisfaction with the equipment’s performance, كفاءة الطاقة, and the professional technical support provided by Dabang Energy throughout the project implementation.